FORT WEAVER ROAD REALIGNMENT AND WIDENING

South of Farrington Highway to the Vicinity of Renton Road

Federal Aid Urban System Project No. M-7600(2)

Archive – 0076-021

 

INDEX TO DRAWINGS

SHEET NO.

DESCRIPTION

1

TITLE SHEET

2

GENERAL PLAN

3 – 4

TYPICAL SECTIONS

5 – 13

ALIGNMENT PLANS

14 – 25

ROADWAY PROFILES AND SUPERELEVATION DIAGRAMS

26

RAMP TERMINAL DETAILS

27 – 29

INTERSECTION DETAILS

30 – 43

GRADING, DRAINAGE AND CONSTRUCTION PLANS

44 – 56

DRAINAGE DETAILS

57 – 71

ROADWAY DETAILS

72

SOIL STABILIZATION PLAN

73 – 74

BORING LOGS

75 – 82

CONSTRUCTION SEQUENCE AND TEMPORARY SIGNING

83

DETOUR PLAN

84 – 112

SIGNING PLANS AND DETAILS

113 – 132

HIGHWAY LIGHTING AND ELECTRICAL PLANS & DETAILS

133 – 156

UTILITY PLANS AND DETAILS

157 – 165

OAHU SUGAR CO. FACILITIES

166 – 167

RAILROAD CROSSING

168 – 185

STRUCTURE PLAN AND DETAILS

186 - 187

CROSS SECTION KEY SHEETS

188 – 244

CROSS SECTIONS